Storrow Kinsella Associates provided construction observation services to assist the full-time construction engineer. Regular progress meetings were held that included the Evansville/Vanderbugh Levee Authority, City Engineer, Board of Public Works, the design firms, and Contractor.
|
||||||
|
|
|
||||||
![]() |
![]() |
||||||
|
|
|||||||
|
|
High flood waters force construction on Dress Plaza to stop. The deteriorated concrete ramp has been removed and the levee wall prepared to receive the serpentine wall and tiered seating. |
Construction activities move to the Esplanade level. Shown here is preparation of concrete forms for one of the three overlooks in the levee wall. |
|||||
![]() |
|||||||
|
|
|||||||
|
|
Representative construction drawing prepared by Storrow Kinsella Associates. | ||||||
|
|
Back to the Evansville
Downtown |
||||||
|
|
|
|
|
|
|
|
|
|
|
Back to the |
||||||
|
|
additional resources |
|
|
|
Project Description [visit] |
Riverfront Slide Show [visit] |
|
|
Riverfront Esplanade [visit] |
Riverfront Maps [visit] |
|
|
Riverfront Dress Plaza [visit] |
Riverfront Pre-Construction Views [visit] |
|
|
Riverfront Graphics [visit] |
Riverfront Festivals [visit] |
|
Riverfront Urban Details [visit] |
Downtown Greenway [visit] |
|
|
|
Riverfront Landscape [visit] |
Evansville Parks Master Plan [visit] |
|
|
||